United States βΊ Grid βΊ Interconnection queues βΊ Indiana
BATTERY STORAGE Β· MISOBattery storage project J2123, Dubois County
Battery storage project J2123, Dubois County is a 50.0 MW battery storage request withdrawn in the MISO interconnection queue, in Dubois County, Indiana, connecting to SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2123
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH
- Connection point (POI)
- Duff 138KV
- Location
- Dubois County, Indiana
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 1 September 2021
- Proposed online date
- August 2024
- Withdrawn
- December 2025
Location
Marker shows the centre of Dubois County; the queue data does not give exact sites.
Other requests in Dubois County
- Solar project J1391, Dubois CountySolar Β· 100 MW Β· agreement signed
- Solar project J1369, Dubois CountySolar Β· 100 MW Β· agreement signed
- Surplus; J1369Other Β· 50.0 MW Β· agreement signed
- Battery storage project J3550, Dubois CountyBattery storage Β· 200 MW Β· in study
- Solar project J1736, Dubois CountySolar Β· 100 MW Β· in study
- Surplus; J1369Other Β· 50.0 MW Β· in study
- Solar project J3208, Dubois CountySolar Β· 10.0 MW Β· in study
- Solar project J1707, Dubois CountySolar Β· 72.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem