United States β€Ί Grid β€Ί Interconnection queues β€Ί New Mexico

ONSHORE WIND Β· WEST

HL250W

HL250W is a 250 MW onshore wind request withdrawn in the West interconnection queue, in Grant County, New Mexico, connecting to El Paso Electric Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2022 (completed)
  2. Withdrawn / abandonedOct 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
LG 22-3-5
Grid region
West (non-ISO utilities)
Utility / transmission owner
El Paso Electric Company
Connection point (POI)
Hidalgo-Luna 345kV Line
Location
Grant County, New Mexico
Technology
Wind: 250 MW
Total requested
250 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 March 2022
Proposed online date
December 2024
Withdrawn
October 2022

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in New Mexico Β· Transmission lines in New Mexico

Other requests in Grant County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem