WIND + STORAGE Β· WEST

Wind + storage project C2-80, Yakima County

Wind + storage project C2-80, Yakima County is a 199 MW wind + storage request withdrawn in the West interconnection queue, in Yakima County, Washington, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
C2-80
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Midway-Union Gap transmission line
Location
Yakima County, Washington
Technology
Wind: 199 MW Β· Battery
Total requested
199 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
11 May 2022
Proposed online date
December 2025

Location

Marker shows the centre of Yakima County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Yakima County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem