Onshore wind project J960, Presque Isle County

Onshore wind project J960, Presque Isle County is a 400 MW onshore wind request withdrawn in the MISO interconnection queue, in Presque Isle County, Michigan, connecting to METC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2018 (completed)
  2. Withdrawn / abandonedMar 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J960
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
Livingston 345kV Substation
Location
Presque Isle County, Michigan
Technology
Wind: 400 MW
Total requested
400 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
12 March 2018
Proposed online date
September 2020
Withdrawn
March 2019

Location

Marker shows the centre of Presque Isle County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Presque Isle County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem