ONSHORE WIND Β· MISOOnshore wind project J960, Presque Isle County
Onshore wind project J960, Presque Isle County is a 400 MW onshore wind request withdrawn in the MISO interconnection queue, in Presque Isle County, Michigan, connecting to METC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMar 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J960
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- METC
- Connection point (POI)
- Livingston 345kV Substation
- Location
- Presque Isle County, Michigan
- Technology
- Wind: 400 MW
- Total requested
- 400 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- September 2020
- Withdrawn
- March 2019
Location
Marker shows the centre of Presque Isle County; the queue data does not give exact sites.
Other requests in Presque Isle County
- Onshore wind project J2260, Presque Isle CountyOnshore wind Β· 252 MW Β· in study
- Solar project J2875, Presque Isle CountySolar Β· 150 MW Β· in study
- Solar project J1914, Presque Isle CountySolar Β· 150 MW Β· in study
- Coal project G820, Presque Isle CountyCoal Β· 600 MW Β· withdrawn
- Onshore wind project J890, Presque Isle CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project J296, Presque Isle CountyOnshore wind Β· 69.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem