SOLAR Β· MISO

Solar project J3455, Trinity County

Solar project J3455, Trinity County is a 250 MW solar request withdrawn in the MISO interconnection queue, in Trinity County, Texas, connecting to EAST TEXAS ELECTRIC COOPERATIVE, INC..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2024 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3455
Grid region
MISO (Midcontinent)
Utility / transmission owner
EAST TEXAS ELECTRIC COOPERATIVE, INC.
Connection point (POI)
ONALASKA
Location
Trinity County, Texas
Technology
Solar: 250 MW
Total requested
250 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
27 March 2024
Proposed online date
June 2028
Withdrawn
September 2025

Location

Marker shows the centre of Trinity County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Trinity County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem