United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Oceanside Energy Storage

Oceanside Energy Storage is a 36.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Nassau County, New York, connecting to LIPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2021 (completed)
  2. Withdrawn / abandonedOct 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1145
Grid region
NYISO (New York)
Utility / transmission owner
LIPA
Developer
EDF Renewables Development, Inc.
Connection point (POI)
Barrett 138 kV
Location
Nassau County, New York
Technology
Battery: 36.0 MW
Total requested
36.0 MW
Queue status
Withdrawn
Entered queue
18 February 2021
Withdrawn
October 2022

Location

Marker shows the centre of Nassau County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Nassau County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem