United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
BATTERY STORAGE Β· MISOBattery storage project J1230, Wadena County
Battery storage project J1230, Wadena County is a 40.0 MW battery storage request withdrawn in the MISO interconnection queue, in Wadena County, Minnesota, connecting to GREAT RIVER ENERGY.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1230
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- GREAT RIVER ENERGY
- Connection point (POI)
- Wing River- Riverton 230kV line
- Location
- Wadena County, Minnesota
- Technology
- Battery: 40.0 MW
- Total requested
- 40.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 27 April 2019
- Proposed online date
- October 2023
- Withdrawn
- March 2021
Location
Marker shows the centre of Wadena County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Wadena County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem