SOLAR Β· SOUTHEASTSolar project IC-1184, Wayne County
Solar project IC-1184, Wayne County is a 100 MW solar request withdrawn in the Southeast interconnection queue, in Wayne County, Mississippi, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedJun 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-1184
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Waynesboro - Lucedale 115 kV line
- Location
- Wayne County, Mississippi
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Energy only (ERIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 23 October 2023
- Proposed online date
- August 2027
- Withdrawn
- June 2024
Location
Marker shows the centre of Wayne County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Wayne County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem