United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

SOLAR Β· MISO

Solar project J988, Wayne County

Solar project J988, Wayne County is a 200 MW solar request withdrawn in the MISO interconnection queue, in Wayne County, Mississippi, connecting to COOPERATIVE ENERGY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2018 (completed)
  2. Withdrawn / abandonedAug 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J988
Grid region
MISO (Midcontinent)
Utility / transmission owner
COOPERATIVE ENERGY
Connection point (POI)
W Waynesboro 230kV Substation
Location
Wayne County, Mississippi
Technology
Solar: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
12 March 2018
Proposed online date
September 2022
Withdrawn
August 2019

Location

Marker shows the centre of Wayne County; the queue data does not give exact sites.

Power plants in Mississippi Β· Transmission lines in Mississippi

Other requests in Wayne County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem