SOLAR Β· MISOSolar project J1105, Dakota County
Solar project J1105, Dakota County is a 200 MW solar request withdrawn in the MISO interconnection queue, in Dakota County, Minnesota, connecting to NORTHERN STATES POWER COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1105
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- NORTHERN STATES POWER COMPANY
- Connection point (POI)
- Hampton Corners 345 kV Substation
- Location
- Dakota County, Minnesota
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- September 2020
- Withdrawn
- March 2021
Location
Marker shows the centre of Dakota County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Dakota County
- Battery storage project J2716, Dakota CountyBattery storage Β· 300 MW Β· in study
- Battery storage project J4065, Dakota CountyBattery storage Β· 200 MW Β· in study
- Battery storage project J3543, Dakota CountyBattery storage Β· 150 MW Β· in study
- Solar project J2027, Dakota CountySolar Β· 150 MW Β· in study
- Battery storage project J3172, Dakota CountyBattery storage Β· 100 MW Β· in study
- Hydro project J1826, Dakota CountyHydro Β· 4.0 MW Β· in study
- Hydro project J3219, Dakota CountyHydro Β· 3.0 MW Β· in study
- Gas project J399, Dakota CountyGas Β· 232 MW Β· built
- Coal project G020, Dakota CountyCoal Β· 147 MW Β· built
- Gas project G259, Dakota CountyGas Β· 1,100 MW Β· withdrawn
- Gas project G223, Dakota CountyGas Β· 750 MW Β· withdrawn
- Gas project G168, Dakota CountyGas Β· 700 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem