United States βΊ Grid βΊ Interconnection queues βΊ Maryland
OTHER Β· PJMOther project L14, Worcester County
Other project L14, Worcester County is a 5.0 MW other request withdrawn in the PJM interconnection queue, in Worcester County, Maryland, connecting to AEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2004 (completed)
- Withdrawn / abandonedAug 2004 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- L14
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEC
- Connection point (POI)
- Berlin 69kV Tap 5 MW
- Location
- Worcester County, Maryland
- Technology
- Diesel: 5.0 MW
- Total requested
- 5.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 20 January 2004
- Proposed online date
- July 2005
- Withdrawn
- August 2004
Location
Marker shows the centre of Worcester County; the queue data does not give exact sites.
Other requests in Worcester County
- Solar + storage project AH2-337, Worcester CountySolar + storage Β· 100 MW Β· in study
- Solar + storage project AJ1-018, Worcester CountySolar + storage Β· 39.0 MW Β· in study
- Solar project AH2-379, Worcester CountySolar Β· 28.3 MW Β· in study
- Worcester NorthSolar Β· 5.0 MW Β· built
- Somerset Solar ProjectSolar Β· 4.0 MW Β· built
- Worcester SouthSolar Β· 2.6 MW Β· built
- Worcester County Renewable EnergyOther Β· 2.0 MW Β· built
- Offshore wind project T122, Worcester CountyOffshore wind Β· 600 MW Β· withdrawn
- Offshore wind project AD2-212, Worcester CountyOffshore wind Β· 160 MW Β· withdrawn
- Solar project AB2-120, Worcester CountySolar Β· 100 MW Β· withdrawn
- Solar + storage project AH2-336, Worcester CountySolar + storage Β· 70.0 MW Β· withdrawn
- Solar project AH2-354, Worcester CountySolar Β· 30.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem