United States βΊ Grid βΊ Interconnection queues βΊ Maryland
SOLAR Β· PJMSolar project AH2-354, Worcester County
Solar project AH2-354, Worcester County is a 30.0 MW solar request withdrawn in the PJM interconnection queue, in Worcester County, Maryland, connecting to DPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2022 (completed)
- Withdrawn / abandonedJul 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH2-354
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Connection point (POI)
- Bishopville - Worcester 138 kV
- Location
- Worcester County, Maryland
- Technology
- Solar: 30.0 MW
- Total requested
- 30.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 10 March 2022
- Proposed online date
- September 2024
- Withdrawn
- July 2022
Location
Marker shows the centre of Worcester County; the queue data does not give exact sites.
Other requests in Worcester County
- Solar + storage project AH2-337, Worcester CountySolar + storage Β· 100 MW Β· in study
- Solar + storage project AJ1-018, Worcester CountySolar + storage Β· 39.0 MW Β· in study
- Solar project AH2-379, Worcester CountySolar Β· 28.3 MW Β· in study
- Worcester NorthSolar Β· 5.0 MW Β· built
- Somerset Solar ProjectSolar Β· 4.0 MW Β· built
- Worcester SouthSolar Β· 2.6 MW Β· built
- Worcester County Renewable EnergyOther Β· 2.0 MW Β· built
- Offshore wind project T122, Worcester CountyOffshore wind Β· 600 MW Β· withdrawn
- Offshore wind project AD2-212, Worcester CountyOffshore wind Β· 160 MW Β· withdrawn
- Solar project AB2-120, Worcester CountySolar Β· 100 MW Β· withdrawn
- Solar + storage project AH2-336, Worcester CountySolar + storage Β· 70.0 MW Β· withdrawn
- Solar project X2-045, Worcester CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem