United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMAugusta Solar
Augusta Solar is a 150 MW solar request withdrawn in the PJM interconnection queue, in Augusta County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2017 (completed)
- Withdrawn / abandonedSep 2024 (project stopped here)
- ConsentedSep 2020 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AC2-112
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Stuarts Draft-Waynesboro 115kV
- Location
- Augusta County, Virginia
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 17 March 2017
- Agreement signed
- 10 September 2020
- Proposed online date
- December 2023
- Withdrawn
- September 2024
Location
Marker shows the centre of Augusta County; the queue data does not give exact sites.
Other requests in Augusta County
- Battery storage project AI1-185, Augusta CountyBattery storage Β· 210 MW Β· in study
- Battery storage project AI2-114, Augusta CountyBattery storage Β· 100 MW Β· in study
- Solar project AI2-036, Augusta CountySolar Β· 100 MW Β· in study
- Solar project AI2-416, Augusta CountySolar Β· 50.0 MW Β· in study
- Solar project AG1-421, Augusta CountySolar Β· 200 MW Β· withdrawn
- Solar + storage project AG1-195, Augusta CountySolar + storage Β· 150 MW Β· withdrawn
- Solar + storage project AG1-196, Augusta CountySolar + storage Β· 150 MW Β· withdrawn
- Round Hill SolarSolar Β· 83.0 MW Β· withdrawn
- Battery storage project AG1-537, Augusta CountyBattery storage Β· 75.0 MW Β· withdrawn
- Solar + storage project AG1-325, Augusta CountySolar + storage Β· 50.0 MW Β· withdrawn
- Battery storage project AG1-422, Augusta CountyBattery storage Β· 50.0 MW Β· withdrawn
- Solar project AC1-070, Augusta CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem