United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
SOLAR Β· MISOSolar project J2240, Nevada County
Solar project J2240, Nevada County is a 120 MW solar request withdrawn in the MISO interconnection queue, in Nevada County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2021 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2240
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- Prescott 337507 to Emmett 337505
- Location
- Nevada County, Arkansas
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 21 December 2021
- Proposed online date
- February 2024
- Withdrawn
- March 2025
Location
Marker shows the centre of Nevada County; the queue data does not give exact sites.
Other requests in Nevada County
- Solar project J2866, Nevada CountySolar Β· 375 MW Β· in study
- Solar project J2864, Nevada CountySolar Β· 375 MW Β· in study
- Solar + storage project J4139, Nevada CountySolar + storage Β· 115 MW Β· in study
- Solar project J2638, Nevada CountySolar Β· 58.0 MW Β· withdrawn
- Solar project J3218, Nevada CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem