United States βΊ Grid βΊ Interconnection queues βΊ Michigan
SOLAR Β· MISOSolar project J861, Marquette County
Solar project J861, Marquette County is a 100 MW solar request withdrawn in the MISO interconnection queue, in Marquette County, Michigan, connecting to American Transmission Co..
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2017 (completed)
- Withdrawn / abandonedMay 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J861
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- American Transmission Co.
- Connection point (POI)
- Dead River - Arnold 345 kV Line
- Location
- Marquette County, Michigan
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 16 June 2017
- Proposed online date
- September 2020
- Withdrawn
- May 2018
Location
Marker shows the centre of Marquette County; the queue data does not give exact sites.
Other requests in Marquette County
- Solar project J1750, Marquette CountySolar Β· 150 MW Β· under construction
- Solar project J1251, Marquette CountySolar Β· 100 MW Β· under construction
- Solar project J2029, Marquette CountySolar Β· 62.5 MW Β· in study
- Gas project J3756, Marquette CountyGas Β· 4.2 MW Β· in study
- Gas project J703, Marquette CountyGas Β· 128 MW Β· built
- Gas project J394, Marquette CountyGas Β· 327 MW Β· withdrawn
- Gas project J413, Marquette CountyGas Β· 243 MW Β· withdrawn
- Gas project J398, Marquette CountyGas Β· 204 MW Β· withdrawn
- Onshore wind project G750, Marquette CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J3281, Marquette CountyOnshore wind Β· 170 MW Β· withdrawn
- Gas project J397, Marquette CountyGas Β· 153 MW Β· withdrawn
- Onshore wind project J470, Marquette CountyOnshore wind Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem