United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

SOLAR + STORAGE Β· SOUTHEAST

Solar + storage project 358A, Jackson County

Solar + storage project 358A, Jackson County is a 50.0 MW solar + storage request withdrawn in the Southeast interconnection queue, in Jackson County, Florida, connecting to Florida Power & Light.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
358A
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Florida Power & Light
Developer
FPL
Connection point (POI)
Holmes Creek - Defuniak Springs (PS) 115kV line
Location
Jackson County, Florida
Technology
Solar: 50.0 MW Β· Battery
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
Facility Study
Queue status
Withdrawn
Entered queue
17 September 2018
Proposed online date
July 2028

Location

Marker shows the centre of Jackson County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Jackson County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem