United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

GAS Β· SOUTHEAST

Gas project 8

Gas project 8 is a 180 MW gas request withdrawn in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
8
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Seminole Electric Cooperative
Connection point (POI)
Hardee Power Station Switchyard
Location
Florida
Technology
Gas: 180 MW
Total requested
180 MW
Service type
NRIS and ERIS
Study phase
Study Phase: Feasibility System Impact; Status: Study complete and presented to customer on 04/13/2013. Withdrawn
Queue status
Withdrawn
Entered queue
14 February 2013
Proposed online date
June 2015

Location

No county location in the queue data.

Power plants in Florida Β· Transmission lines in Florida