United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

ONSHORE WIND Β· SPP

Onshore wind project GEN-2016-143, Texas County

Onshore wind project GEN-2016-143, Texas County is a 175 MW onshore wind request withdrawn in the SPP interconnection queue, in Texas County, Oklahoma, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2016 (completed)
  2. Withdrawn / abandonedOct 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingOct 2020 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2016-143
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
AEP
Connection point (POI)
Riverside 345kV Substation
Location
Texas County, Oklahoma
Technology
Wind: 175 MW
Total requested
175 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
29 November 2016
Proposed online date
October 2020
Came online
October 2020
Withdrawn
October 2020

Location

Marker shows the centre of Texas County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Texas County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem