United States β€Ί Grid β€Ί Interconnection queues β€Ί Kentucky

SOLAR Β· SOUTHEAST

Solar project LGE-GIS-2019-003, Meade County

Solar project LGE-GIS-2019-003, Meade County is a 121 MW solar request withdrawn in the Southeast interconnection queue, in Meade County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
LGE-GIS-2019-003
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Louisville Gas & Electric and Kentucky Utilities Energy
Connection point (POI)
Cloverport β€šΓ„Γ¬ Tiptop 138 kV line
Location
Meade County, Kentucky
Technology
Solar: 121 MW
Total requested
121 MW
Service type
Network resource (NRIS)
Study phase
LGIA Terminated
Queue status
Withdrawn
Entered queue
7 February 2019
Proposed online date
December 2022

Location

Marker shows the centre of Meade County; the queue data does not give exact sites.

Power plants in Kentucky Β· Transmission lines in Kentucky

Other requests in Meade County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem