United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR Β· MISOSolar project J1600, Meade County
Solar project J1600, Meade County is a 40.0 MW solar request withdrawn in the MISO interconnection queue, in Meade County, Kentucky, connecting to BIG RIVERS ELECTRIC CORPORATION.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedJul 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1600
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- BIG RIVERS ELECTRIC CORPORATION
- Connection point (POI)
- Flaherty Tap to Custer 69kV
- Location
- Meade County, Kentucky
- Technology
- Solar: 40.0 MW
- Total requested
- 40.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 19 June 2020
- Proposed online date
- October 2022
- Withdrawn
- July 2023
Location
Marker shows the centre of Meade County; the queue data does not give exact sites.
Other requests in Meade County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem