United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
BATTERY STORAGE Β· SPPBattery storage project GEN-2022-245, Kidder County
Battery storage project GEN-2022-245, Kidder County is a 200 MW battery storage request withdrawn in the SPP interconnection queue, in Kidder County, North Dakota, connecting to BEPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2022 (completed)
- Withdrawn / abandonedNov 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-245
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- BEPC
- Connection point (POI)
- Line tap of existing Leland Olds (Secondary) - Groton 345 kV line
- Location
- Kidder County, North Dakota
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 10 March 2022
- Proposed online date
- September 2028
- Withdrawn
- November 2023
Location
Marker shows the centre of Kidder County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Kidder County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem