United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
SOLAR Β· SPPSolar project GEN-2022-247, Kidder County
Solar project GEN-2022-247, Kidder County is a 375 MW solar request withdrawn in the SPP interconnection queue, in Kidder County, North Dakota, connecting to BEPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2023 (completed)
- Withdrawn / abandonedNov 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-247
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- BEPC
- Connection point (POI)
- Leland Olds (Secondary) - Groton 345 kV line
- Location
- Kidder County, North Dakota
- Technology
- Solar: 375 MW
- Total requested
- 375 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 24 March 2023
- Proposed online date
- September 2028
- Withdrawn
- November 2023
Location
Marker shows the centre of Kidder County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Kidder County
- Solar project GEN-2022-246, Kidder CountySolar Β· 342 MW Β· withdrawn
- Battery storage project GEN-2022-245, Kidder CountyBattery storage Β· 200 MW Β· withdrawn
- Solar project GEN-2024-225, Kidder CountySolar Β· 200 MW Β· withdrawn
- Onshore wind project G993, Kidder CountyOnshore wind Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem