SOLAR · SOUTHEASTSolar project 915773, Dillon County
Solar project 915773, Dillon County is a 65.0 MW solar request in interconnection study in the Southeast interconnection queue, in Dillon County, South Carolina, connecting to Duke Energy Progress.
- PlanningQueued Sep 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- Operating (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 915773
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Connection point (POI)
- WEATHERSPOON PLANT - LATTA 230KV - FLORENCE
- Location
- Dillon County, South Carolina
- Technology
- Solar: 65.0 MW
- Total requested
- 65.0 MW
- Service type
- Other
- Study phase
- Facility Study - In Progress
- Queue status
- Active
- Entered queue
- 28 September 2023
Location
Marker shows the centre of Dillon County; the queue data does not give exact sites.
Power plants in South Carolina · Transmission lines in South Carolina
Other requests in Dillon County
- Solar project 261, Dillon CountySolar · 49.9 MW · in study
- Solar project 956528, Dillon CountySolar · 9.0 MW · in study
- Solar project 968543, Dillon CountySolar · 4.0 MW · in study
- Battery storage project 232, Dillon CountyBattery storage · 250 MW · withdrawn
- Solar project 105, Dillon CountySolar · 200 MW · withdrawn
- Solar project 225, Dillon CountySolar · 150 MW · withdrawn
- Solar project 61, Dillon CountySolar · 75.0 MW · withdrawn
- Other project PP00030, Dillon CountyOther · 65.0 MW · withdrawn
- Solar project 4538, Dillon CountySolar · 10.0 MW · withdrawn
- Solar project 4484, Dillon CountySolar · 2.0 MW · withdrawn
- Solar project 19139, Dillon CountySolar · 2.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem