United States βΊ Grid βΊ Interconnection queues βΊ South Carolina
BATTERY STORAGE Β· SOUTHEASTBattery storage project 232, Dillon County
Battery storage project 232, Dillon County is a 250 MW battery storage request withdrawn in the Southeast interconnection queue, in Dillon County, South Carolina, connecting to Santee Cooper.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 232
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Santee Cooper
- Location
- Dillon County, South Carolina
- Technology
- Battery: 250 MW
- Total requested
- 250 MW
- Service type
- Network resource (NRIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 1 June 2023
- Proposed online date
- January 2027
Location
Marker shows the centre of Dillon County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Dillon County
- Solar project 915773, Dillon CountySolar Β· 65.0 MW Β· in study
- Solar project 261, Dillon CountySolar Β· 49.9 MW Β· in study
- Solar project 956528, Dillon CountySolar Β· 9.0 MW Β· in study
- Solar project 968543, Dillon CountySolar Β· 4.0 MW Β· in study
- Solar project 105, Dillon CountySolar Β· 200 MW Β· withdrawn
- Solar project 225, Dillon CountySolar Β· 150 MW Β· withdrawn
- Solar project 61, Dillon CountySolar Β· 75.0 MW Β· withdrawn
- Other project PP00030, Dillon CountyOther Β· 65.0 MW Β· withdrawn
- Solar project 4538, Dillon CountySolar Β· 10.0 MW Β· withdrawn
- Solar project 4484, Dillon CountySolar Β· 2.0 MW Β· withdrawn
- Solar project 19139, Dillon CountySolar Β· 2.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem