SOLAR Β· SPP

Solar project GEN-2017-054, Lincoln County

Solar project GEN-2017-054, Lincoln County is a 102 MW solar request withdrawn in the SPP interconnection queue, in Lincoln County, South Dakota, connecting to WAPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedJan 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2017-054
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WAPA
Connection point (POI)
Virgil Fodness 230 kV Sub
Location
Lincoln County, South Dakota
Technology
Solar: 102 MW
Total requested
102 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 May 2017
Proposed online date
December 2019
Withdrawn
January 2018

Location

Marker shows the centre of Lincoln County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Lincoln County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem