SOLAR Β· SPPSolar project GEN-2017-054, Lincoln County
Solar project GEN-2017-054, Lincoln County is a 102 MW solar request withdrawn in the SPP interconnection queue, in Lincoln County, South Dakota, connecting to WAPA.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2017 (completed)
- Withdrawn / abandonedJan 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2017-054
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WAPA
- Connection point (POI)
- Virgil Fodness 230 kV Sub
- Location
- Lincoln County, South Dakota
- Technology
- Solar: 102 MW
- Total requested
- 102 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 30 May 2017
- Proposed online date
- December 2019
- Withdrawn
- January 2018
Location
Marker shows the centre of Lincoln County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Lincoln County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem