United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
SOLAR Β· SPPSolar project GEN-2022-090, Mccurtain County
Solar project GEN-2022-090, Mccurtain County is a 150 MW solar request withdrawn in the SPP interconnection queue, in Mccurtain County, Oklahoma, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2022 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-090
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Valiant Substation 138kV
- Location
- Mccurtain County, Oklahoma
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 15 November 2022
- Proposed online date
- September 2026
- Withdrawn
- March 2025
Location
Marker shows the centre of Mccurtain County; the queue data does not give exact sites.
Other requests in Mccurtain County
- Solar + storage project GEN-2020-020, Mccurtain CountySolar + storage Β· 202 MW Β· agreement signed
- Solar + storage project GEN-2021-063, Mccurtain CountySolar + storage Β· 155 MW Β· in study
- Gas project GEN-2000-004, Mccurtain CountyGas Β· 800 MW Β· withdrawn
- Gas project GEN-2000-009, Mccurtain CountyGas Β· 500 MW Β· withdrawn
- Battery storage project GEN-2022-091, Mccurtain CountyBattery storage Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem