GAS Β· PJMGas project S04, Essex County
Gas project S04, Essex County is a 633 MW gas request withdrawn in the PJM interconnection queue, in Essex County, New Jersey, connecting to PSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2007 (completed)
- Withdrawn / abandonedNov 2007 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- S04
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PSEG
- Connection point (POI)
- Essex 230kV
- Location
- Essex County, New Jersey
- Technology
- Gas: 633 MW
- Total requested
- 633 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 13 February 2007
- Proposed online date
- July 2010
- Withdrawn
- November 2007
Location
Marker shows the centre of Essex County; the queue data does not give exact sites.
Power plants in New Jersey Β· Transmission lines in New Jersey
Other requests in Essex County
- Newark Energy CenterGas Β· 625 MW Β· built
- Newark Energy CenterGas Β· 45.0 MW Β· built
- Newark Energy CenterGas Β· 35.0 MW Β· built
- Essex 9Gas Β· 6.0 MW Β· built
- Rutgers GenerationGas Β· 5.0 MW Β· built
- Essex County Correctional FacilityGas Β· 3.0 MW Β· built
- West Caldwell SolarSolar + storage Β· 2.0 MW Β· built
- Newark I SPSolar Β· 0.8 MW Β· built
- Clay ST SPSolar Β· 0.5 MW Β· built
- Cook Rd SPSolar Β· 0.4 MW Β· built
- Newark II SPSolar Β· 0.4 MW Β· built
- Gas project X2-050, Essex CountyGas Β· 705 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem