United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

GAS Β· SOUTHEAST

Gas project 2

Gas project 2 is a 566 MW gas request withdrawn in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Seminole Electric Cooperative
Connection point (POI)
Hardee Switchyard
Location
Florida
Technology
Gas: 566 MW
Total requested
566 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: Feasibility; Status: Withdrawn
Queue status
Withdrawn
Entered queue
19 October 2007
Proposed online date
June 2011

Location

No county location in the queue data.

Power plants in Florida Β· Transmission lines in Florida

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem