United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· SPPSolar project GEN-2014-043, Gaines County
Solar project GEN-2014-043, Gaines County is a 80.0 MW solar request withdrawn in the SPP interconnection queue, in Gaines County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2014 (completed)
- Withdrawn / abandonedFeb 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2014-043
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Seagraves 115kV Sub
- Location
- Gaines County, Texas
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 29 September 2014
- Proposed online date
- December 2016
- Withdrawn
- February 2015
Location
Marker shows the centre of Gaines County; the queue data does not give exact sites.
Other requests in Gaines County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem