United States › Grid › Interconnection queues › Michigan
GAS · MISOGas project J704, Baraga County
Gas project J704, Baraga County is a 54.9 MW gas request built and operating in the MISO interconnection queue, in Baraga County, Michigan, connecting to American Transmission Co..
Request details
- Queue ID
- J704
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- American Transmission Co.
- Connection point (POI)
- M38 Substation 138kV
- Location
- Baraga County, Michigan
- Technology
- Gas: 54.9 MW
- Total requested
- 54.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: In Service
- Queue status
- Operational
- Entered queue
- 8 September 2016
- Agreement signed
- 19 December 2017
- Proposed online date
- December 2018
- Came online
- December 2018
Location
Marker shows the centre of Baraga County; the queue data does not give exact sites.
Other requests in Baraga County
- Gas project J3800, Baraga CountyGas · 1.8 MW · in study
- Other project G343, Baraga CountyOther · 20.0 MW · built
- Gas project G342, Baraga CountyGas · 18.0 MW · built
- Onshore wind project J711, Baraga CountyOnshore wind · 130 MW · withdrawn
- Solar + storage project J3648, Baraga CountySolar + storage · 120 MW · withdrawn
- Onshore wind project J1138, Baraga CountyOnshore wind · 70.0 MW · withdrawn
- Onshore wind project J879, Baraga CountyOnshore wind · 70.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem