ONSHORE WIND Β· MISO

Onshore wind project J879, Baraga County

Onshore wind project J879, Baraga County is a 70.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Baraga County, Michigan, connecting to American Transmission Co..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2017 (completed)
  2. Withdrawn / abandonedMay 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J879
Grid region
MISO (Midcontinent)
Utility / transmission owner
American Transmission Co.
Connection point (POI)
North Lake 138 kV Substation
Location
Baraga County, Michigan
Technology
Wind: 70.0 MW
Total requested
70.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
16 June 2017
Proposed online date
September 2020
Withdrawn
May 2018

Location

Marker shows the centre of Baraga County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Baraga County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem