United States βΊ Grid βΊ Interconnection queues βΊ Michigan
SOLAR Β· MISOSolar project J833, Washtenaw County
Solar project J833, Washtenaw County is a 100 MW solar request withdrawn in the MISO interconnection queue, in Washtenaw County, Michigan, connecting to ITC MIDWEST.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2017 (completed)
- Withdrawn / abandonedOct 2021 (project stopped here)
- ConsentedJun 2020 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J833
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Milan-Pioneer 120kV line tap
- Location
- Washtenaw County, Michigan
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 16 June 2017
- Agreement signed
- 17 June 2020
- Proposed online date
- April 2022
- Withdrawn
- October 2021
Location
Marker shows the centre of Washtenaw County; the queue data does not give exact sites.
Other requests in Washtenaw County
- Solar project J799, Washtenaw CountySolar Β· 189 MW Β· under construction
- Solar project J1224, Washtenaw CountySolar Β· 170 MW Β· under construction
- Battery storage project J1659, Washtenaw CountyBattery storage Β· 100 MW Β· under construction
- Battery storage project J1329, Washtenaw CountyBattery storage Β· 20.0 MW Β· under construction
- Solar project J1062, Washtenaw CountySolar Β· 200 MW Β· agreement signed
- Gas project J3923, Washtenaw CountyGas Β· 1,414 MW Β· in study
- Solar project J3945, Washtenaw CountySolar Β· 245 MW Β· in study
- Surplus; J1062Other Β· 150 MW Β· in study
- Battery storage project J3009, Washtenaw CountyBattery storage Β· 150 MW Β· in study
- Battery storage project J3654, Washtenaw CountyBattery storage Β· 150 MW Β· in study
- Battery storage project J1844, Washtenaw CountyBattery storage Β· 100 MW Β· in study
- Surplus; J1224/J1329Other Β· 85.1 MW Β· in study