United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

WIND + STORAGE Β· WEST

Wind + storage project G0704, Adams County

Wind + storage project G0704, Adams County is a 400 MW wind + storage request withdrawn in the West interconnection queue, in Adams County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0704
Grid region
West (non-ISO utilities)
Connection point (POI)
Hatton 115 kV Substation
Location
Adams County, Washington
Technology
Wind: 200 MW Β· Battery: 200 MW
Total requested
400 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
23 September 2021
Proposed online date
September 2025

Location

Marker shows the centre of Adams County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Adams County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem