United States βΊ Grid βΊ Interconnection queues βΊ Illinois
BATTERY STORAGE Β· PJMBattery storage project AF1-281, Lee County
Battery storage project AF1-281, Lee County is a 20.0 MW battery storage request withdrawn in the PJM interconnection queue, in Lee County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2019 (completed)
- Withdrawn / abandonedJun 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF1-281
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Developer
- Deriva Energy Solar, LLC
- Connection point (POI)
- Nelson-Lee County
- Location
- Lee County, Illinois
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 10 September 2019
- Proposed online date
- December 2022
- Withdrawn
- June 2024
Location
Marker shows the centre of Lee County; the queue data does not give exact sites.
Other requests in Lee County
- Shady Oaks Wind Power ProjectOnshore wind Β· 106 MW Β· agreement signed
- Steward Creek SolarSolar Β· 300 MW Β· in study
- South Dixon SolarSolar Β· 300 MW Β· in study
- Solar project AH1-151, Lee CountySolar Β· 200 MW Β· in study
- Solar project AH1-150, Lee CountySolar Β· 200 MW Β· in study
- Steward Creek SolarSolar Β· 200 MW Β· in study
- South Dixon SolarSolar Β· 200 MW Β· in study
- Solar project AH1-044, Lee CountySolar Β· 200 MW Β· in study
- Solar project AH1-338, Lee CountySolar Β· 180 MW Β· in study
- Battery storage project AH2-015, Lee CountyBattery storage Β· 110 MW Β· in study
- Steward Creek SolarSolar Β· 100 MW Β· in study
- Battery storage project AH2-123, Lee CountyBattery storage Β· 100 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem