ONSHORE WIND · WEST

LifeLine Renewable Energy

LifeLine Renewable Energy is a 200 MW onshore wind request withdrawn in the West interconnection queue, in Morrow County, Oregon, connecting to Lifeline Renewable Energy, Inc..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2003 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G119
Grid region
West (non-ISO utilities)
Utility / transmission owner
Lifeline Renewable Energy, Inc.
Developer
Lifeline Renewable Energy, Inc.
Connection point (POI)
BPA's McNary - Santiam 230kV Line
Location
Morrow County, Oregon
Technology
Wind: 200 MW
Total requested
200 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
17 September 2003
Proposed online date
October 2004

Location

Marker shows the centre of Morrow County; the queue data does not give exact sites.

Power plants in Oregon · Transmission lines in Oregon

Other requests in Morrow County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem