United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Barrett Hempstead Battery Storage

Barrett Hempstead Battery Storage is a 40.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Nassau County, New York, connecting to LIPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1254
Grid region
NYISO (New York)
Utility / transmission owner
LIPA
Developer
Barrett Hempstead Battery Storage
Connection point (POI)
Barrett to Long Beach 33 kV circuit No 1(33-224)
Location
Nassau County, New York
Technology
Battery: 40.0 MW
Total requested
40.0 MW
Queue status
Withdrawn
Entered queue
22 September 2021

Location

Marker shows the centre of Nassau County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Nassau County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem