United States βΊ Grid βΊ Interconnection queues βΊ Indiana
ONSHORE WIND Β· PJMOnshore wind project X1-040, Dekalb County
Onshore wind project X1-040, Dekalb County is a 360 MW onshore wind request withdrawn in the PJM interconnection queue, in Dekalb County, Indiana, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2011 (completed)
- Withdrawn / abandonedMar 2013 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- X1-040
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Collingwood-Hiple 345kV
- Location
- Dekalb County, Indiana
- Technology
- Wind: 360 MW
- Total requested
- 360 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 29 March 2011
- Proposed online date
- December 2013
- Withdrawn
- March 2013
Location
Marker shows the centre of Dekalb County; the queue data does not give exact sites.
Other requests in Dekalb County
- Sculpin SolarSolar Β· 180 MW Β· agreement signed
- Solar project AI2-421, Dekalb CountySolar Β· 43.2 MW Β· in study
- Solar project AI2-430, Dekalb CountySolar Β· 11.0 MW Β· in study
- Solar project AG2-576, Dekalb CountySolar Β· 180 MW Β· withdrawn
- Thalassa Energy ProjectSolar Β· 96.0 MW Β· withdrawn
- Solar project AF2-125, Dekalb CountySolar Β· 54.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem