SOLAR + STORAGE Β· MISO

Solar + storage project J1574, West Carroll Parish County

Solar + storage project J1574, West Carroll Parish County is a 99.0 MW solar + storage request withdrawn in the MISO interconnection queue, in West Carroll Parish County, Louisiana, connecting to ENTERGY LOUISIANA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2020 (completed)
  2. Withdrawn / abandonedAug 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1574
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY LOUISIANA
Connection point (POI)
Darnell 115kV
Location
West Carroll Parish County, Louisiana
Technology
Solar: 99.0 MW Β· Battery
Total requested
99.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA In Process; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
24 June 2020
Proposed online date
August 2023
Withdrawn
August 2021

Location

Marker shows the centre of West Carroll Parish County; the queue data does not give exact sites.

Power plants in Louisiana Β· Transmission lines in Louisiana

Other requests in West Carroll Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem