United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

BATTERY STORAGE Β· SPP

Battery storage project GEN-2022-064, Major County

Battery storage project GEN-2022-064, Major County is a 80.0 MW battery storage request withdrawn in the SPP interconnection queue, in Major County, Oklahoma, connecting to WFEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2022 (completed)
  2. Withdrawn / abandonedNov 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2022-064
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WFEC
Connection point (POI)
Cedardale 138 kV Substation
Location
Major County, Oklahoma
Technology
Battery: 80.0 MW
Total requested
80.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
22 July 2022
Proposed online date
April 2027
Withdrawn
November 2023

Location

Marker shows the centre of Major County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Major County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem