ONSHORE WIND Β· MISO

Onshore wind project J497, Benton County

Onshore wind project J497, Benton County is a 170 MW onshore wind request withdrawn in the MISO interconnection queue, in Benton County, Iowa.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2015 (completed)
  2. Withdrawn / abandonedNov 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J497
Grid region
MISO (Midcontinent)
Connection point (POI)
ITC 161 kV Dysart substation
Location
Benton County, Iowa
Technology
Wind: 170 MW
Total requested
170 MW
Study phase
GIA
Queue status
Withdrawn
Entered queue
13 November 2015
Proposed online date
July 2017
Withdrawn
November 2016

Location

Marker shows the centre of Benton County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Benton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem