United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project G1021, Cowlitz County

Onshore wind project G1021, Cowlitz County is a 530 MW onshore wind request withdrawn in the West interconnection queue, in Cowlitz County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G1021
Grid region
West (non-ISO utilities)
Connection point (POI)
Lexington Substation
Location
Cowlitz County, Washington
Technology
Wind: 530 MW
Total requested
530 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
21 November 2023
Proposed online date
December 2028

Location

Marker shows the centre of Cowlitz County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Cowlitz County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem