United States βΊ Grid βΊ Interconnection queues βΊ Oregon
SOLAR Β· WESTSolar project 599, Douglas County
Solar project 599, Douglas County is a 10.0 MW solar request withdrawn in the West interconnection queue, in Douglas County, Oregon, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2014 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 599
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Circuit 5U32, Green, Roseburg sub
- Location
- Douglas County, Oregon
- Technology
- Solar: 10.0 MW
- Total requested
- 10.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- WITHDRAWN BY CUSTOMER
- Queue status
- Withdrawn
- Entered queue
- 30 July 2014
- Proposed online date
- December 2016
Location
Marker shows the centre of Douglas County; the queue data does not give exact sites.
Other requests in Douglas County
- Battery storage project G0807, Douglas CountyBattery storage Β· 600 MW Β· in study
- Other project G0806, Douglas CountyOther Β· 600 MW Β· in study
- Battery storage project G0808, Douglas CountyBattery storage Β· 600 MW Β· in study
- Solar + storage project G0887, Douglas CountySolar + storage Β· 400 MW Β· in study
- Battery storage project G0801, Douglas CountyBattery storage Β· 200 MW Β· in study
- Gas project T2-002, Douglas CountyGas Β· 20.0 MW Β· in study
- Other project 5, Douglas CountyOther Β· 20.0 MW Β· built
- Hydro project 284, Douglas CountyHydro Β· 6.0 MW Β· built
- Hydro project 75, Douglas CountyHydro Β· 3.0 MW Β· built
- Other project 366, Douglas CountyOther Β· 1.6 MW Β· built
- Battery storage project G0809, Douglas CountyBattery storage Β· 600 MW Β· withdrawn
- Solar project G0996, Douglas CountySolar Β· 400 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem