United States › Grid › Interconnection queues › Oregon
BATTERY STORAGE · WESTBattery storage project G0808, Douglas County
Battery storage project G0808, Douglas County is a 600 MW battery storage request in interconnection study in the West interconnection queue, in Douglas County, Oregon.
Queue statusIn planning
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2030 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- G0808
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- BPA's Gardiner 115 kV substation or Tahkenitch 230 kV substation
- Location
- Douglas County, Oregon
- Technology
- Battery: 600 MW
- Total requested
- 600 MW
- Service type
- NRIS and ERIS
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 16 September 2022
- Proposed online date
- December 2030
Location
Marker shows the centre of Douglas County; the queue data does not give exact sites.
Other requests in Douglas County
- Battery storage project G0807, Douglas CountyBattery storage · 600 MW · in study
- Other project G0806, Douglas CountyOther · 600 MW · in study
- Solar + storage project G0887, Douglas CountySolar + storage · 400 MW · in study
- Battery storage project G0801, Douglas CountyBattery storage · 200 MW · in study
- Gas project T2-002, Douglas CountyGas · 20.0 MW · in study
- Other project 5, Douglas CountyOther · 20.0 MW · built
- Hydro project 284, Douglas CountyHydro · 6.0 MW · built
- Hydro project 75, Douglas CountyHydro · 3.0 MW · built
- Other project 366, Douglas CountyOther · 1.6 MW · built
- Battery storage project G0809, Douglas CountyBattery storage · 600 MW · withdrawn
- Solar project G0996, Douglas CountySolar · 400 MW · withdrawn
- Other project G0804, Douglas CountyOther · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem