United States βΊ Grid βΊ Interconnection queues βΊ Ohio
ONSHORE WIND Β· PJMOnshore wind project W2-007, Putnam County
Onshore wind project W2-007, Putnam County is a 100 MW onshore wind request withdrawn in the PJM interconnection queue, in Putnam County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2010 (completed)
- Withdrawn / abandonedJan 2013 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- W2-007
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- East Leipsic 138kV
- Location
- Putnam County, Ohio
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 14 May 2010
- Proposed online date
- December 2013
- Withdrawn
- January 2013
Location
Marker shows the centre of Putnam County; the queue data does not give exact sites.
Other requests in Putnam County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem