United States › Grid › Interconnection queues › Louisiana
SOLAR · MISOSolar project J2526, Red River Parish County
Solar project J2526, Red River Parish County is a 200 MW solar request in interconnection study in the MISO interconnection queue, in Red River Parish County, Louisiana, connecting to CLECO POWER.
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2526
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- CLECO POWER
- Connection point (POI)
- Layfield - Western Kraft 230.0kV
- Location
- Red River Parish County, Louisiana
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 14 September 2022
- Proposed online date
- October 2026
Location
Marker shows the centre of Red River Parish County; the queue data does not give exact sites.
Other requests in Red River Parish County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem