United States β€Ί Grid β€Ί Interconnection queues β€Ί South Dakota

SOLAR Β· SPP

Solar project GEN-2020-093, Potter County

Solar project GEN-2020-093, Potter County is a 150 MW solar request withdrawn in the SPP interconnection queue, in Potter County, South Dakota, connecting to BEPC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedApr 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2020-093
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
BEPC
Connection point (POI)
Whitlock Substation 230 kV
Location
Potter County, South Dakota
Technology
Solar: 150 MW
Total requested
150 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 April 2020
Proposed online date
November 2026
Withdrawn
April 2023

Location

Marker shows the centre of Potter County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Potter County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem