United States β€Ί Grid β€Ί Interconnection queues β€Ί South Carolina

OTHER Β· SOUTHEAST

Other project PP00039, Darlington County

Other project PP00039, Darlington County is a 70.0 MW other request withdrawn in the Southeast interconnection queue, in Darlington County, South Carolina, connecting to Duke Energy Progress.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
PP00039
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Progress
Connection point (POI)
Robinson - Florence 230
Location
Darlington County, South Carolina
Technology
Other: 70.0 MW
Total requested
70.0 MW
Study phase
Provisional IR Withdrawn
Queue status
Withdrawn
Entered queue
13 August 2025
Proposed online date
August 2027

Location

Marker shows the centre of Darlington County; the queue data does not give exact sites.

Power plants in South Carolina Β· Transmission lines in South Carolina

Other requests in Darlington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem