United States βΊ Grid βΊ Interconnection queues βΊ Florida
SOLAR Β· SOUTHEASTSolar project 603, Union County
Solar project 603, Union County is a 74.9 MW solar request withdrawn in the Southeast interconnection queue, in Union County, Florida, connecting to Florida Power & Light.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 603
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- Third Party
- Connection point (POI)
- Union County
- Location
- Union County, Florida
- Technology
- Solar: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 14 November 2023
- Proposed online date
- December 2027
Location
Marker shows the centre of Union County; the queue data does not give exact sites.
Other requests in Union County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem