United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR + STORAGE Β· PJMSolar + storage project AI1-136, Brunswick County
Solar + storage project AI1-136, Brunswick County is a 200 MW solar + storage request withdrawn in the PJM interconnection queue, in Brunswick County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJan 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AI1-136
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Brodnax 115 kV
- Location
- Brunswick County, Virginia
- Technology
- Solar: 200 MW Β· Battery
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 8 September 2022
- Proposed online date
- June 2026
- Withdrawn
- January 2024
Location
Marker shows the centre of Brunswick County; the queue data does not give exact sites.
Other requests in Brunswick County
- Solar project AG2-570, Brunswick CountySolar Β· 400 MW Β· in study
- Honeybee Solar, LLCSolar Β· 301 MW Β· in study
- Solar project AG2-069, Brunswick CountySolar Β· 150 MW Β· in study
- Solar project AG2-581, Brunswick CountySolar Β· 150 MW Β· in study
- Battery storage project AH2-291, Brunswick CountyBattery storage Β· 150 MW Β· in study
- Battery storage project AG2-571, Brunswick CountyBattery storage Β· 100 MW Β· in study
- Solar project AG2-068, Brunswick CountySolar Β· 100 MW Β· in study
- Solar + storage project AI2-004, Brunswick CountySolar + storage Β· 80.0 MW Β· in study
- Brunswick Battery StorageBattery storage Β· 75.0 MW Β· in study
- Solar project AH2-080, Brunswick CountySolar Β· 52.7 MW Β· in study
- Brunswick Combined Cycle Power StationGas Β· 1,526 MW Β· built
- King - QueenOther Β· 10.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem