GAS Β· SPP

Gas project GEN-2018-034, Mayes County

Gas project GEN-2018-034, Mayes County is a 40.0 MW gas request withdrawn in the SPP interconnection queue, in Mayes County, Oklahoma, connecting to GRDA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2018 (completed)
  2. Withdrawn / abandonedDec 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2018-034
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
GRDA
Connection point (POI)
Grand River Energy Center 161kV
Location
Mayes County, Oklahoma
Technology
Gas: 40.0 MW
Total requested
40.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
29 May 2018
Proposed online date
June 2018
Withdrawn
December 2019

Location

Marker shows the centre of Mayes County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Mayes County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem